The strength of tree roots!!!
87 Lot TownHouse Subdivision at Griffin. Cut off the top of the hill — at Tesch Road Griffin.. Deep cut for a road box — at Tesch Road Griffin.. Earthworks have started. Watch out for nasty surprises, Deep roots. Existing dam wall on right of this photo leaks. Leaks real bad. Boxing out external road. An unsuitable area in the box needs replacing. Timber retaining walls started. Footing in for Masonary wall to start. First part of Masonary wall built . Backfilling Masonary wall. Gravel in for External road
Empty dam ready to strip . Starting to strip out dam to make ready for filling in. Pete's started backfilling. Half way Pete. Nearly done. One more day should do it. Another bloody dam to fill in, thats a 25 tonne excavator..Deep bugger
Start filling Pete. Pete said you throw and i'll push, and away they go. Almost done Boof. Well done Boof. Again we find buried rubbish. Now an area found where the fill was not done properly on the lot, find the extremities and do it properly.
Laying Kerband Channel on external road, I hope that storm does'nt hit us. Chip seal of external road. Happy days, AC is going down. Bottom course in on road widening and Electrical crossing complete. Laying the AC, always good to see. Island done, linemarking complete.
Housing construction started stage 1 — at Tesch Road Griffin. Stage 2 earthworks 5 days off completion. Field inlet finished , then signage and that will be roadwidening complete. New buisiness cards on order. Pete's (Boofs) 25th birthday today, from sleeping in the ute 5 years ago to number 1 bobcat operator and best mate
Bulk earthworks completed stage 2 — at Tesch Road Griffin. Stage 2 lots and walls cut and trimmed. Masonary walls well under way. Building construction stargted stage 1. Building construction well under way. Bulk earthworks completed stage 2. Stage 2 lots and walls cut and trimmed.
Another townhouse development started at Griffin. Earthworks 80% complete, drainage has started.
A nice little culvert crossing constructed before the road widening gets boxed out ready for gravel layers
Head wall on culverts, batter protection slab in place and V drain poured ready for topsoil and turf. Primer seal being laid, Asphalt on Monday.. another job done
Asphalt laid, road open, job done.
Linemarking and turf done, Road widening finished
A little 14 lot subdivision constructed at Karawatha. Nothing like working close to home.
The construction of a 1 into 2 subdivision in suburbia.
A new town house subdivision started at Dakabin, 3 dams to empty and fill, then into the earthworks.
First dam backfilled, two to go then earthworks begin.
There’s a bit of earth to move in this job,2 X 615 scrapers a D6 Dozer and an 815 compactor should do it.